Ovit Mountain Avalanche Tunnels
PROJECT: Ovit Mountain Avalanche Tunnels
OWNER: Karayolları Genel Müdürlüğü
DATE OF CONTRACT 12.05.2014
COMPLETION DATE 14.12.2018
PROJECT SCOPE Ovit Mountain Tunnel is located on the Ovit Mountain route, which connects the Eastern Black Sea to Eastern Anatolia.
Project; construction of the tunnel with a total length of 14,300 m, double tube tunnel part of 1,500 meters
consists of.

