Trabzon Drinking Water Transmission Line
PROJECT: Trabzon Drinking Water Transmission Line
CONTRACT DATE: 05.09.2016
COMPLETION DATE OF WORK: 02.01.2020
STEEL PIPELINE: 92.950 m
WATER TANK: 14 PIECES
PROMOTION CENTER: 7 PIECES

